Filter by tags: China France Finland Areva Clear all tag filters
6 news articles found
India and France have agreed to strengthen their defence and security partnership following Indian Prime Minister Narendra Modi's visit to France at the invitation of French President Emmanuel Macron. Following extensive discussions, a joint communique noted the strengthening of the strategic partnership between the two countries. Among other things, it “recognised that the promotion of clean and low-carbon energy, the preservation of biodiversity, the protection of the oceans and the fight against pollution were essential aspects of cooperation”.
- Source: NEI Magazine
- Date: Thursday, 20 July 2023
- Original article: neimagazine.com/news/newsindia-and-france-strengthen-defence-and-security-partnership-including-nuclear-11018226
Spanish, French and Slovakian engineering firms IDOM, Assystem and VUJE have set up the NUClear Engineering Alliance (NUCEAL) to support the development of EDF’s projects in the European Union. The joint venture was launched in Lyon, France, in the presence of French Minister for Energy Transition Agnès Pannier-Runacher.
- Source: NEI Magazine
- Date: Friday, 23 June 2023
- Original article: neimagazine.com/news/newsnuclear-engineering-alliance-formed-to-support-edfs-european-projects-10959071
Finland's fifth nuclear reactor, Olkiluoto 3 (OL3), has reached first criticality. The EPR (European Pressurised Water Reactor) is the first new nuclear unit to be commissioned in Finland in over 40 years, and will eventually produce some 14% of the country's electricity.
- Source: World Nuclear News
- Date: Wednesday, 22 December 2021
- Original article: world-nuclear-news.org/Articles/Europe-s-first-EPR-reaches-criticality
“On Wednesday, October 13, 2021, EDF submitted to the Polish government a preliminary, non-binding offer for a contract covering the execution of engineering, procurement and construction (EPC) works from four to six EPR (European Pressurised Reactors), representing a total installed capacity of 6.6 to 9.9 GW in two to three locations,” the French company said in a statement.
“The initial offering includes all key programme parameters such as plant configuration, industrial schematic, local supply chain development plans, cost estimate and schedule,” the statement added.
EDF said the offer supports the implementation of the objectives of the Polish nuclear energy programme adopted by the Polish government in October 2020. It also aims to define the principles of the Polish-French strategic partnership supporting “an ambitious energy transformation plan consistent with the European goal of carbon neutrality”.
- Source: Nucnet
- Date: Thursday, 14 October 2021
- Original article: nucnet.org/news/france-s-edf-submits-non-binding-offer-to-build-up-to-six-eprs-10-3-2021
Finnish utility Teollisuuden Voima Oyj (TVO) said on 27 March that fuel loading had begun at unit 3 of the Olkiluoto NPP and was expected to continue for a week. During the months following the fuel loading, the EPR reactor will undergo a range of tests as maintenance and finalisation work continues. These will include hot functional testing, in which the reactor and turbine island will be submitted to dozens of separate tests at different pressure and temperature levels. Previous hot functional testing took place in 2018.
- Source: NEI Magazine
- Date: Wednesday, 31 March 2021
- Original article: neimagazine.com/news/newsfuel-loading-begins-at-finlands-ol3-8635270
Finnish utility Teollisuuden Voima Oyj (TVO) has been granted a permit by the country's Radiation and Nuclear Safety Authority (STUK) to load fuel into the reactor of the Olkiluoto 3 (OL3) EPR. The unit, construction of which began in 2005, is scheduled to enter commercial operation early next year.
- Source: World Nuclear News
- Date: Saturday, 27 March 2021
- Original article: world-nuclear-news.org/Articles/TVO-cleared-for-fuel-loading-at-Finnish-EPR