Filter by tags: United States Europe ITER Clear all tag filters
13 news articles found
The Sino-French TAC-1 consortium - led by China National Nuclear Corporation subsidiary China Nuclear Power Engineering and including Framatome - has been awarded a contract to assemble the vacuum chamber modules of the International Thermonuclear Experimental Reactor (ITER), under construction in Cadarache, southern France.
- Source: World Nuclear News
- Date: Wednesday, 06 March 2024
- Original article: world-nuclear-news.org/Articles/Contract-for-ITER-vacuum-vessel-assembly
The first of five vacuum vessel sectors under the responsibility of Fusion for Energy (F4E) - the Iter Organisation's European domestic agency - is undergoing factory acceptance tests. The component has already passed leak testing and its dimensions will now be checked.
- Source: World Nuclear News
- Date: Wednesday, 07 February 2024
- Original article: world-nuclear-news.org/Articles/First-European-made-ITER-vessel-sector-awaits-ship
Opening the International Atomic Energy Agency (IAEA) 29th Fusion Energy Conference (FEC 2023) in London, IAEA Director General Rafael Mariano Grossi began by wishing a happy 40th anniversary to the Joint European Torus (JET) which operates at Culham near Oxford. Jet was “the first tritium experiment in Europe, breaker of scientific records, producer of generations of accomplished scientists and engineers, and a true magnet for international collaboration,” he said.
- Source: NEI Magazine
- Date: Wednesday, 18 October 2023
- Original article: neimagazine.com/news/newsiaeas-29th-fusion-energy-conference-attracts-2000-participants-11224380
The International Thermonuclear Experimental Reactor (ITER) under construction at Saint-Paul-les-Durance in southern France is facing more delays, ITER director general Pietro Barabaschi said in an interview with AFP.
- Source: NEI Magazine
- Date: Friday, 13 January 2023
- Original article: neimagazine.com/news/newsmore-delays-for-iter-10511382
China National Nuclear Corp's Southwestern Institute of Physics says that the first piece of the enhanced heat flux first wall for the International Thermonuclear Experimental Reactor has been produced, with its core indicators better than design requirements.
- Source: World Nuclear News
- Date: Friday, 25 November 2022
- Original article: world-nuclear-news.org/Articles/China-celebrates-first-enhanced-heat-flux-first-wa
Researchers at the Joint European Torus in the UK doubled previous records by producing a total of 59 megajoules of heat energy from fusion over a five second period.
- Source: World Nuclear News
- Date: Thursday, 10 February 2022
- Original article: world-nuclear-news.org/Articles/Fusion-energy-record-at-JET-huge-step-forward
The Council of the ITER Organisation said on 19 November that it had reviewed in a videoconference the performance of the ITER Project toward first plasma in view of the COVID-19 restrictions.
- Source: NEI Magazine
- Date: Wednesday, 25 November 2020
- Original article: neimagazine.com/news/newsiter-says-schedule-maintained-despite-covid-19-8376161
The International Thermonuclear Experimental Reactor (ITER) Organisation on 15 October signed a Cooperation Agreement with the Canadian government, which sets out terms for the transfer of Canadian-supplied nuclear material (tritium), and tritium-related equipment and technology.
- Source: NEI Magazine
- Date: Friday, 23 October 2020
- Original article: neimagazine.com/news/newscanada-returns-to-iter-8195013
It is understandable that the nuclear power industry feels it has been left "in limbo" by the European Commission's taxonomy on sustainable finance, even though its low-carbon credentials are clear, an adviser to the Technical Expert Group (TEG) that developed the guidance said last week. Sean Kidney, CEO of the Climate Bonds Initiative, participated in the 28 July webinar-based discussion of a newly published Policy Brief by the OECD-Nuclear Energy Agency (NEA), Unlocking financing for nuclear energy infrastructure in the COVID-19 economic recovery.
- Source: World Nuclear News
- Date: Tuesday, 04 August 2020
- Original article: world-nuclear-news.org/Articles/EU-Taxonomy-leaves-low-carbon-nuclear-in-limbo-adm
The ITER group, in a ceremony on 28 July marked the start of the machine assembly of the international experimental tokamak nuclear fusion reactor under construction at Cadarache in France.
- Source: NEI Magazine
- Date: Friday, 31 July 2020
- Original article: neimagazine.com/news/newsassembly-of-iter-begins-in-france-8053044