Latest News

Filters

Filter by tags: United States Rosatom China Clear all tag filters

90 news articles found


In early April, the first shipment of equipment in 2024 for the International Thermonuclear Experimental Reactor (ITER), which is being built in France, will take place from Russia’s DV Efremov Institute of Electrophysical Apparatus (NIIEFA, part of Rosatom). The equipment was developed and manufactured at NIIEFA in St Petersburg by order of Rosatom, within the framework of the International ITER project.

Date: Wednesday, 20 March 2024
Original article: neimagazine.com/news/newsrosatom-prepares-equipment-for-iter-11612622

The Nuclear Energy Agency (NEA) has published the second edition of its Small Modular Reactor Dashboard which tracks the progress of selected small modular reactor (SMR) designs towards deployment. NEA says the SMR designs are at various stages of development, from fundamental research on new concepts to commercial deployment and operation of mature designs.

Date: Saturday, 02 March 2024
Original article: neimagazine.com/news/newsnea-launches-second-edition-of-its-small-modular-reactor-dashboard-11561305

Manufacturing and testing of prototype first wall panels for the International Thermonuclear Experimental Reactor (ITER) fusion machine has been successfully completed, says St Petersburg-based JSC NIIEFA - part of the Russian state nuclear corporation Rosatom.

Date: Friday, 12 January 2024
Original article: world-nuclear-news.org/Articles/Russia-ready-to-mass-produce-first-wall-panels-for

Over the last several years evidence has been mounting that a large expansion of nuclear energy capacity is indispensable for keeping global warning within 1.5°C limits. Multiple studies have confirmed that, contrary to the claims by “all-renewables” zealots, no single group of technologies can enable a timely and cost-efficient energy transition, and a diversified energy mix of low-carbon sources, including both intermittent renewables and nuclear, is needed to achieve net-zero by 2050. The most recent estimates suggest that the global nuclear energy installed capacity needs to increase 2.5-3 times from the current 370 GW to between 916 GWe and 1,160 GW by 2050.

Date: Thursday, 28 December 2023
Original article: neimagazine.com/news/newsglobal-smr-buildout-needs-a-new-marshall-plan-11398436

Specialists at the St Petersburg-based JSC NIIEFA - part of the Russian state nuclear corporation Rosatom - have started acceptance tests of a full-scale prototype of the first wall panel for the International Thermonuclear Experimental Reactor (ITER) fusion machine under construction in Cadarache, southern France.

Date: Tuesday, 15 August 2023
Original article: world-nuclear-news.org/Articles/Testing-of-ITER-wall-panels-under-way

The Nuclear Energy Agency (NEA) has published a 60-page supplement to “The NEA Small Modular Reactor Dashboard”, which it published in March. The Dashboard tracks the progress of selected small modular reactor (SMR) designs towards deployment.

Date: Thursday, 27 July 2023
Original article: neimagazine.com/news/newsnea-issues-supplement-to-its-smr-dashboard-11030329

Iran’s First Vice President Mohammad Mokhber has said Iran should become self-sufficient in designing and building nuclear reactors. He made the suggestion during a working group meeting arranged to draw up plans for producing 20,000 MWe of nuclear power by 2041.

Date: Friday, 21 July 2023
Original article: neimagazine.com/news/newsiran-plans-five-new-npps-11019864

Turkey is in talks with Russia, China and South Korea over its planned second and third nuclear power plants, and with the USA and United Kingdom over small modular reactors (SMRs), Energy Minister Alparslan Bayraktar is reported to have told a media briefing.

Date: Tuesday, 11 July 2023
Original article: world-nuclear-news.org/Articles/Turkey-aiming-for-20GW-of-nuclear-by-2050s