Latest News

Filters

Filter by tags: Rosatom Nuclear fusion Clear all tag filters

29 news articles found


Rosatom has listed the result for 2023 of the state programme: “Development of Engineering, Technologies & Scientific Research (RTTN Razvitii Tekhniki Tekhnologii I Nauchnikh Issledovanii) in the field of the use of atomic energy in the Russian Federation”.

Date: Saturday, 06 April 2024
Original article: neimagazine.com/news/newsrosatom-lists-results-of-science-and-technology-development-programme-11661393

The physical launch of Russia’s multi-purpose fast neutron research reactor MBIR (Mnogotselevoi Bistrii Issledovatelskii Reaktor) under construction at the Scientific Research Institute of Atomic Reactors (NIIAR) in Dimitrovgrad, Ulyanovsk region, is officially scheduled for launch in 2027. In 2028 it will begin supplying electricity to the site and a pilot programme is planned.

Date: Thursday, 29 February 2024
Original article: neimagazine.com/news/newsrussias-multi-purpose-fast-research-reactor-to-launch-in-2027-11554106

Manufacturing and testing of prototype first wall panels for the International Thermonuclear Experimental Reactor (ITER) fusion machine has been successfully completed, says St Petersburg-based JSC NIIEFA - part of the Russian state nuclear corporation Rosatom.

Date: Friday, 12 January 2024
Original article: world-nuclear-news.org/Articles/Russia-ready-to-mass-produce-first-wall-panels-for

In the second half of 2024, Russian specialists plan to conduct experiments in China and South Korea using unique domestic material that can be used at the International Experimental Thermonuclear Reactor (ITER) being built in Cadarache, France.

Date: Thursday, 07 December 2023
Original article: neimagazine.com/news/newsrosatom-plans-to-test-new-material-for-the-first-wall-of-iter-11351995

Installation of the building dome has been completed for the multi-purpose fast neutron research reactor MBIR (Mnogotselevoi Bistrii Issledovatelskii Reaktor) under construction at the Scientific Research Institute of Atomic Reactors (NIIAR) in Dimitrovgrad (Ulyanovsk region).

Date: Friday, 20 October 2023
Original article: neimagazine.com/news/newsrosatom-completes-dome-for-mbir-reactor-building-11232826

Specialists at Russia’s DV Efremov Institute of Electrophysical Apparatus (NIIEFA, part of Rosatom) in St Petersburg have begun acceptance tests of the full-scale prototype panel for the first wall of the International Thermonuclear Experimental Reactor ITER under construction at Cadarache in France.

Date: Thursday, 17 August 2023
Original article: neimagazine.com/news/newsrussian-specialists-test-prototype-of-wall-panel-for-iter-11076958

Specialists at the St Petersburg-based JSC NIIEFA - part of the Russian state nuclear corporation Rosatom - have started acceptance tests of a full-scale prototype of the first wall panel for the International Thermonuclear Experimental Reactor (ITER) fusion machine under construction in Cadarache, southern France.

Date: Tuesday, 15 August 2023
Original article: world-nuclear-news.org/Articles/Testing-of-ITER-wall-panels-under-way

Russia’s DV Efremov Institute of Electrophysical Apparatus (NIIEFA, part of Rosatom) says a Japanese test assembly has completed testing for the International Thermonuclear Experimental Reactor (ITER), under construction in France. Eight elements of a prototype divertor, passed 6,000 test cycles at loads from 5 to 20 MW per square metre, confirming "the compliance of the Japanese element with the highest requirements" of ITER. The tests were carried out at the ITER Divertor Test Facility (IDTF) in St Petersburg, which supports tasks for the ITER project.

Date: Wednesday, 12 July 2023
Original article: neimagazine.com/news/newsrussias-niiefa-tests-japanese-component-for-iter-11000375

The first thermonuclear plasma has been achieved at the T-15MD tokamak, at Russia’s Kurchatov Institute and the facility is operating steadily, according to Kurchative Institute President Mikhail Kovalchuk. The physical launch of the T-15MD tokamak took place in May 2021. "The stable plasma, at millions of degrees Celsius, has been obtained.… This most complicated and expensive installation started up immediately and is now working, gaining power and reaching global parameters,” he said.

Date: Wednesday, 19 April 2023
Original article: neimagazine.com/news/newsrussias-t-15md-tokamak-achieves-first-stable-plasma-10770011

A poloidal field coil - the largest component being produced in Russia for the multinational fusion project - has completed its journey to the International Thermonuclear Experimental Reactor (ITER) construction site in France.

Date: Tuesday, 14 February 2023
Original article: world-nuclear-news.org/Articles/ITER-Russian-poloidal-field-coil-arrives-at-constr