Latest News

Filters

Filter by tags: Italy Russia Spent nuclear fuel Clear all tag filters

14 news articles found


Ukrainian nuclear utility Energoatom says it has begun transporting used nuclear fuel from its operating reactors to the newly built and commissioned Holtec-engineered Central Spent Fuel Storage Facility (CSFSF) known as a Consolidated Interim Storage (CIS) Facility in the US. The CSFSF is expected to save approximately $200m a year compared with the previous practice of transporting used fuel to Russia for reprocessing. “Today, Ukraine is entirely self-sufficient in the strategically crucial area of storage and management of the used nuclear fuel discharged by its reactors eliminating a critical constraint in the continued generation of electricity by the nation’s nine reactors,” Energoatom noted.

Date: Wednesday, 03 January 2024
Original article: neimagazine.com/news/newsoperations-begin-at-ukraines-used-fuel-dry-storage-facility-11406011

Energoatom and Holtec have announced that Ukraine's new Centralised Spent Fuel Storage Facility (CSFSF) is up and running receiving used nuclear fuel from the country's nuclear power plants.

Date: Thursday, 21 December 2023
Original article: world-nuclear-news.org/Articles/Ukraine-s-centralised-fuel-storage-facility-fully

Russia has asked for International Atomic Energy Agency (IAEA) Director General Rafael Mariano Grossi to brief an emergency meeting of the United Nations Security Council about the situation at the Zaporizhzhia nuclear power plant in Ukraine. Meanwhile G7 foreign ministers have demanded Russia "hand back full control" of the plant "to its rightful sovereign owner, Ukraine".

Date: Thursday, 11 August 2022
Original article: world-nuclear-news.org/Articles/G7-demands-Russia-hand-over-Zaporizhzhia,-Russia-c

First Akkuyu plant due online in 2023 with possibility of more units at Sinop and Igneada The first Akkuyu unit is expected to come online in 2023 with a further unit starting every year afterwards. Courtesy Rosatom. New nuclear reactors under construction and being planned in Turkey will help meet the fast-growing economy’s “massive” demand for energy and reduce the country’s dependence on polluting fossil fuels, the Italian representative of the NIATR (Nuclear Industry Association of Turkish Republic) said.

According to Turkey’s ministry of energy and natural resources, energy consumption in 2012 was 239 TWh a year, while in 2023 forecasts say it could reach as much as 478 TWh.

However, Massimo Giorgi of NIATR told NucNet that the current energy mix will not meet demand and the lack of reliable, diversified, low-cost energy is an obstacle to Ankara’s economic plans.

Once fully operational, the $20bn Akkuyu nuclear power station, where Turkey is building four 1,114-MW pressurised water reactor units supplied by Russia, will provide about 10% of the country’s total electricity generation.

Date: Tuesday, 18 January 2022
Original article: nucnet.org/news/new-reactors-will-help-meet-massive-demand-for-energy-and-reduce-reliance-on-fossil-fuels-1-1-2022

Ukraine's nuclear regulator has issued a permit to SSE Chernobyl Nuclear Power Plant (ChNPP) for the retrieval of undamaged used nuclear fuel from the ISF-1 interim used fuel wet storage facility. The fuel will be moved into the new ISF-2 dry storage facility. The State Nuclear Regulatory Inspectorate of Ukraine (SNRIU) has also issued a licence for the operation of the Liquid Radioactive Waste Treatment Plant at the Chernobyl site.

Date: Thursday, 27 May 2021
Original article: world-nuclear-news.org/Articles/Permit-issued-for-Chernobyl-used-fuel-transfer

Thirty-five years on from the Chernobyl accident, Ukraine and the International Atomic Energy Agency (IAEA) have highlighted their commitment to cooperation in nuclear power. Meanwhile Ukraine’s nuclear regulator has launched the start of operations at a new storage facility for used nuclear fuel at the Chernobyl site.  

Date: Wednesday, 28 April 2021
Original article: world-nuclear-news.org/Articles/Title

China's first ship for the transport of used nuclear fuel has been delivered to China National Nuclear Corporation (CNNC). The independently produced double-hulled vessel meets the INF-3 (Irradiated Nuclear Fuel class 3) standards set by the International Maritime Organisation.

Date: Friday, 11 December 2020
Original article: world-nuclear-news.org/Articles/China-commissions-first-used-fuel-transport-ship

The first canister of used nuclear fuel was yesterday loaded into the Interim Spent Nuclear Fuel Storage Facility (ISF-2) at the Chernobyl plant in Ukraine. ISF-2 is the largest dry-type used fuel storage facility in the world and has an operating life of at least 100 years.

Date: Friday, 20 November 2020
Original article: world-nuclear-news.org/Articles/First-assemblies-loaded-into-new-Chernobyl-used-fu

€400m plant, backed by international donors, will provide safe storage for a minimum of 100 years Hot testing has begun at the €400m ISF-2 facility at Chernobyl. Courtesy EBRD. Hot testing has started at the Interim Storage Facility 2 (ISF-2) in Chernobyl where spent nuclear fuel from reactors 1, 2 and 3 at the destroyed nuclear station will be processed and stored in the world’s largest nuclear dry storage once full operations have started.

The start of hot testing on 10 September was approved by the Ukrainian regulator following the successful completion of previous system-wide trials of the facility, constructed by an international consortium led by the US company Holtec and financed by the international community through the Nuclear Safety Account, managed by the European Bank for Reconstruction and Development (EBRD).

The processing and storage of the spent nuclear fuel at Chernobyl is one of the key remaining tasks at the site. While the 1986 accident destroyed reactor 4, the more than 21,000 fuel assemblies used in the RMBK-type reactors 1, 2 and 3 were removed in the following years and provisionally stored in a wet pond facility.

The new ISF-2 will replace the current site storage arrangements, providing safe storage for a minimum of 100 years. A purpose-built special train will transport the spent nuclear fuel assemblies to the ISF-2 facility where they will be cut, dried and packaged into double-walled canisters in the specially designed processing facility and – finally – transferred to the newly constructed onsite storage modules.

Date: Saturday, 12 September 2020
Original article: nucnet.org/news/hot-testing-begins-at-isf-2-interim-spent-fuel-facility-9-5-2020