Latest News

Filters

Filter by tags: Generation IV reactor Netherlands Clear all tag filters

6 news articles found


Netherlands-based start-up, Thorizon, and Belgium-based engineering and consulting company Tractebel (part of France’s Engie) have signed a strategic three-year partnership to advance Thorizon’ molten salt reactor design. Tractebel will provide engineering services for the Thorizon One molten salt reactor, including support on the conceptual design, computational modelling, cost estimates and design reviews.

Date: Thursday, 29 February 2024
Original article: neimagazine.com/news/newstractebel-partners-with-thorizon-on-molten-salt-reactor-11554105

Consultancy firm KPMG on 7 July released a report on nuclear energy market consultation, which discusses the conditions under which market parties are prepared to invest in NPPs in the Netherlands, what public support is required for this, and which regions are interested in establishing a nuclear plant. The 151-page report was compiled at the request of the House of Representatives in response to a motion by Klaas Dijkhoff put forward in September 2020. KPGM began work on the study on 8 February this year.

Date: Thursday, 15 July 2021
Original article: neimagazine.com/news/newskpmg-looks-at-feasibility-of-newbuild-in-netherlands-8893831

Market participants - such as contractors, operators and suppliers - would invest in the construction of new nuclear generating capacity in the Netherlands provided the government contributes to the cost and there is public support, a report by consultancy firm KPMG indicates. In response to the study, demissionary Minister for Economic Affairs Dilan Yesilgöz-Zegerius has requested a study into the possibility of including nuclear power in the country's plans for meeting energy and climate goals.

Date: Friday, 09 July 2021
Original article: world-nuclear-news.org/Articles/Dutch-study-finds-commercial-support-for-nuclear-n

Start-up nuclear energy company Fermi Energia on 16 February announced an initial investment round for a proposed reactor in Estonia, saying it will file a planning application later this year, ETV news show "Aktuaalne kaamera" (AK) reported. The new call for funding aims to complete a series of investments of €2.5 million ($3m) required to formally launch the planning project for deployment of a small modular reactor (SMR).

Date: Friday, 19 February 2021
Original article: neimagazine.com/news/newsestonias-fermi-energia-seeks-1m-to-launch-smr-planning-procedure-8532118

Estonia needs to put in place the necessary legislation and competencies if a small modular reactor (SMR) is to be in operation by 2035, speakers at a conference organised by Fermi Energia agreed yesterday. The Baltic country aims to stop generating electricity from oil shale by 2035, but has yet to officially launch a nuclear programme.

Date: Thursday, 11 February 2021
Original article: world-nuclear-news.org/Articles/No-time-to-waste-in-Estonian-SMR-deployment-confer

The challenges the nuclear industry faces are largely external and must be overcome if it is to help tackle the existential threat of climate change, panellists in the Nuclear Energy and its Future session of the Reuters Next conference on 11 January said. These challenges include: the notion nuclear is an out-dated technology; the cost of finance; market design; political changes; perceived competition with renewable energy; and the public's misconceptions about radioactive waste.

Date: Friday, 15 January 2021
Original article: world-nuclear-news.org/Articles/The-real-challenges-to-nuclear-are-external,-says