Latest News

Filters

Filter by tags: ITER Electric current Clear all tag filters

3 news articles found


US-based General Atomics (GA) and UK-based Tokamak Energy Ltd have signed a memorandum of understanding (MOU) for collaboration in the area of High Temperature Superconducting (HTS) technology for fusion energy and other industry applications. This will leverage both GA’s capabilities for manufacturing large-scale magnet systems and Tokamak Energy’s expertise in HTS magnet technologies.

Date: Saturday, 03 June 2023
Original article: neimagazine.com/news/newsgeneral-atomics-and-tokamak-energy-to-collaborate-on-advancing-high-temperature-superconducting-magnet-technologies-10911684

US-based General Atomics (GA) on10 August marked the completion and shipment of the first Central Solenoid module for the International Thermonuclear Experimental Reactor (ITER) under construction in Saint-Paul-lès-Durance in southern France, with a celebration at the firm’s Magnet Technologies Centre (MTC) in California. The module recently arrived in France after being shipped from the MTC in late June and is scheduled to reach the ITER site in the coming weeks. Five additional modules, plus one spare, are at various stages of fabrication, with the second module expected to ship this month. The Central Solenoid will be assembled as the modules arrive on site and is scheduled to be fully installed in 2023-24. ITER is scheduled to begin its first plasma operations in 2025.

Date: Wednesday, 18 August 2021
Original article: neimagazine.com/news/newsgeneral-atomics-marks-completion-of-first-central-solenoid-module-for-iter-9005140

The first International Thermonuclear Experimental Reactor (Iter) diagnostic components to be supplied by Fusion For Energy (F4E) have been delivered to the Iter site in Cadarache, southern France.

Date: Monday, 13 March 2017
Original article: neimagazine.com/news/newsdiagnostic-components-delivered-to-iter-5761596

Projects

Status

No Tags found.