Latest News

Filters

Filter by tags: Tokamak United States Clear all tag filters

89 news articles found


UK-based Tokamak Energy is developing new laser measurement technology to control extreme conditions inside future fusion power. Plasma temperatures inside a tokamak reach over 100m degrees Celsius. The hydrogen fuel must be closely and accurately measured by a specialist laser system to keep the hot plasma stable, hold density and maintain fusion conditions.

Date: Thursday, 21 March 2024
Original article: neimagazine.com/news/newstokamak-energy-to-develop-new-laser-technology-for-fusion-plant-operations-11616489

In early April, the first shipment of equipment in 2024 for the International Thermonuclear Experimental Reactor (ITER), which is being built in France, will take place from Russia’s DV Efremov Institute of Electrophysical Apparatus (NIIEFA, part of Rosatom). The equipment was developed and manufactured at NIIEFA in St Petersburg by order of Rosatom, within the framework of the International ITER project.

Date: Wednesday, 20 March 2024
Original article: neimagazine.com/news/newsrosatom-prepares-equipment-for-iter-11612622

Chinese-French TAC-1 (CNPE) consortium has won a contract for the sub-assembly of modules for the vacuum vessel of the International Thermonuclear Experimental Reactor (ITER), under construction at Cadarache in southern France. The consortium includes China Nuclear Power Engineering (a subsidiary of China National Nuclear Corporation - CNNC); China Nuclear Industry 23 Construction Company Ltd; Southwestern Institute of Physics; Institute of Plasma Physics, Chinese Academy of Sciences ASIPP; and France’s Framatome.

Date: Wednesday, 13 March 2024
Original article: neimagazine.com/news/newschinese-french-consortium-to-assemble-iter-vacuum-chamber-11594527

The Sino-French TAC-1 consortium - led by China National Nuclear Corporation subsidiary China Nuclear Power Engineering and including Framatome - has been awarded a contract to assemble the vacuum chamber modules of the International Thermonuclear Experimental Reactor (ITER), under construction in Cadarache, southern France.

Date: Wednesday, 06 March 2024
Original article: world-nuclear-news.org/Articles/Contract-for-ITER-vacuum-vessel-assembly

US-based fusion technology company Type One Energy Group plans to locate to the Tennessee Valley Authority’s (TVA) Bull Run Fossil Plant in Clinton, Tennessee to build a stellarator fusion prototype machine in collaboration with TVA and the Department of Energy’s (DOE’s) Oak Ridge National Laboratory (ORNL). TVA's Bull Run Fossil Plant closed on 1 December 2023.Type One says construction of the prototype, Infinity One, could begin in 2025, following the completion of necessary environmental reviews, partnership agreements, required permits, and operating licences.

Date: Wednesday, 28 February 2024
Original article: neimagazine.com/news/newsfusion-reactor-prototype-planned-for-tva-site-11552220

The UK Atomic Energy Authority (UKAEA) and the private Japanese fusion company Kyoto Fusioneering (KF) have signed a Communication Framework Agreement to advance tritium breeding blanket technology from its conceptual stage towards commercialisation. It also lays the for future collaboration on thetritium fuel cycle, as well as remote handling and power conversion technologies.

Date: Saturday, 24 February 2024
Original article: neimagazine.com/news/newsukaea-and-kyoto-fusioneering-extend-co-operation-11541228

US fusion energy developer Type One Energy Group has announced plans to build Infinity One - its stellarator fusion prototype machine - at Tennessee Valley Authority's Bull Run Fossil Plant in Clinton, Tennessee.

Date: Saturday, 24 February 2024
Original article: world-nuclear-news.org/Articles/Prototype-fusion-reactor-planned-for-TVA-site

The ITER Organisation is preparing a new timeline for construction of the International Thermonuclear Experimental Reactor (ITER) being built at Cadarache in France. As part of work underway to update the ITER Project Baseline, a group of experts met in February to evaluate the new blueprint for achieving ITER's research goals.

Date: Friday, 23 February 2024
Original article: neimagazine.com/news/newsiter-prepares-new-timeline-11540250

The revamped project plan for the International Thermonuclear Experimental Reactor - with modifications to its configuration, phased installation and new research schedule - is being finalised ahead of being submitted to the ITER Council in June.

Date: Wednesday, 21 February 2024
Original article: world-nuclear-news.org/Articles/ITER-s-proposed-new-timeline-to-be-submitted-in-Ju

Manufacturing and testing of prototype first wall panels for the International Thermonuclear Experimental Reactor (ITER) fusion machine has been successfully completed, says St Petersburg-based JSC NIIEFA - part of the Russian state nuclear corporation Rosatom.

Date: Friday, 12 January 2024
Original article: world-nuclear-news.org/Articles/Russia-ready-to-mass-produce-first-wall-panels-for