Latest News

Filters

Filter by tags: China France India Fusion power United States Tokamak Clear all tag filters

8 news articles found


The Council of the ITER Organisation said on 19 November that it had reviewed in a videoconference the performance of the ITER Project toward first plasma in view of the COVID-19 restrictions.

Date: Wednesday, 25 November 2020
Original article: neimagazine.com/news/newsiter-says-schedule-maintained-despite-covid-19-8376161

The ITER group, in a ceremony on 28 July marked the start of the machine assembly of the international experimental tokamak nuclear fusion reactor under construction at Cadarache in France.

Date: Friday, 31 July 2020
Original article: neimagazine.com/news/newsassembly-of-iter-begins-in-france-8053044

Plan is to generate first ultra-hot plasma at €20bn facility in 2025 The €20bn project will replicate the reactions that power the sun and is intended to demonstrate fusion power can be generated on a commercial scale. Photo courtesy Iter. The world’s largest nuclear fusion project began its five-year assembly phase on Tuesday in southern France, with the first ultra-hot plasma expected to be generated in late 2025.

The €20bn Iter (International Thermonuclear Experimental Reactor) project will replicate the reactions that power the sun and is intended to demonstrate fusion power can be generated on a commercial scale.

The steel and concrete superstructures nestled in the hills of southern France will house a 23,000-tonne machine, known as a tokamak, capable of creating what is essentially an earthbound star.

Millions of components will be used to assemble the giant reactor, which will weigh 23,000 tonnes and the project is the most complex engineering endeavour in history. Almost 3,000 tonnes of superconducting magnets, some heavier than a jumbo jet, will be connected by 200km of superconducting cables, all kept at -269C by the world’s largest cryogenic plant.

Date: Wednesday, 29 July 2020
Original article: nucnet.org/news/world-s-largest-nuclear-fusion-project-under-assembly-in-france-7-2-2020

The Iter tokamak buiding earlier this month at the construction site in southern France. Photo courtesy Iter. The Italian state shipyard that supplies the country’s warships has won a contract worth nearly €100m to enter a new business – nuclear fusion.

Fincantieri, based in Trieste and the largest shipbuilder in Europe, won the deal to supply equipment for the International Thermonuclear Experimental Reactor, a multinational collaboration aimed at building an experimental hydrogen fusion reactor at Cadarache in the south of France.

Fincantieri said in a statement that the work would include a number of high-profile systems, components, installations as part of the Iter project.

A temporary consortium has been established for the work. It includes Fincantieri itself as the main contractor, its subsidiary Fincantieri SI, active in the field of plant design and industrial-scale electrical, electronic and electromechanical components, Delta-ti Impianti, specialised in mechanical plant engineering, and Comes, specialised in electrical plant engineering.

Date: Saturday, 25 January 2020
Original article: nucnet.org/news/italian-state-shipyard-wins-eur100m-nuclear-fusion-contract-1-5-2020

China has completed the construction of the HL-2M tokamak fusion reactor at a research centre in Chengdu, the capital city of southwest China’s Sichuan province.

Date: Friday, 29 November 2019
Original article: neimagazine.com/news/newschina-completes-new-tokamak-7531412

Canada’s Minister of International Trade, François-Philippe Champagne, on 17 April signed a memorandum of understanding (MOU) with the International Thermonuclear Experimental Reactor (Iter) on possible Canadian participation in construct the fusion reactor now being built at Cadarache in France. 

Date: Monday, 30 April 2018
Original article: neimagazine.com/news/newscanada-considers-rejoining-iter-6133160

The Korean Superconducting Tokamak Advanced Research (KSTAR), a tokamak nuclear fusion reactor, achieved a world record of 70 seconds in high-performance plasma operation, South Korea's National Fusion Research Institute (NFRI) said in a statement on 14 December. NFRI said a fully non-inductive operation mode - a "high poloidal beta scenario" - had been used to achieve this long and steady state of operation using a high-power neutron beam. It said various techniques, including a rotating 3D field, had been applied to alleviate the accumulated heat fluxes on the plasma-facing components.

Date: Thursday, 22 December 2016
Original article: neimagazine.com/news/newsmilestones-for-several-fusion-reactors-5703886