Latest News

Filters

Filter by tags: China European Union United States India Japan Russia Clear all tag filters

54 news articles found


Chinese-French TAC-1 (CNPE) consortium has won a contract for the sub-assembly of modules for the vacuum vessel of the International Thermonuclear Experimental Reactor (ITER), under construction at Cadarache in southern France. The consortium includes China Nuclear Power Engineering (a subsidiary of China National Nuclear Corporation - CNNC); China Nuclear Industry 23 Construction Company Ltd; Southwestern Institute of Physics; Institute of Plasma Physics, Chinese Academy of Sciences ASIPP; and France’s Framatome.

Date: Wednesday, 13 March 2024
Original article: neimagazine.com/news/newschinese-french-consortium-to-assemble-iter-vacuum-chamber-11594527

The Sino-French TAC-1 consortium - led by China National Nuclear Corporation subsidiary China Nuclear Power Engineering and including Framatome - has been awarded a contract to assemble the vacuum chamber modules of the International Thermonuclear Experimental Reactor (ITER), under construction in Cadarache, southern France.

Date: Wednesday, 06 March 2024
Original article: world-nuclear-news.org/Articles/Contract-for-ITER-vacuum-vessel-assembly

The ITER Organisation is preparing a new timeline for construction of the International Thermonuclear Experimental Reactor (ITER) being built at Cadarache in France. As part of work underway to update the ITER Project Baseline, a group of experts met in February to evaluate the new blueprint for achieving ITER's research goals.

Date: Friday, 23 February 2024
Original article: neimagazine.com/news/newsiter-prepares-new-timeline-11540250

The revamped project plan for the International Thermonuclear Experimental Reactor - with modifications to its configuration, phased installation and new research schedule - is being finalised ahead of being submitted to the ITER Council in June.

Date: Wednesday, 21 February 2024
Original article: world-nuclear-news.org/Articles/ITER-s-proposed-new-timeline-to-be-submitted-in-Ju

The first of five vacuum vessel sectors for the International Thermonuclear Experimental Reactor (ITER) under construction at Cadarache in France to be supplied by Fusion for Energy (F4E) is undergoing factory acceptance tests. The component has already passed leak testing and its dimensions will now be checked.

Date: Friday, 09 February 2024
Original article: neimagazine.com/news/newsiter-vacuum-vessel-sector-undergoes-factory-acceptance-testing-11501287

The first of five vacuum vessel sectors under the responsibility of Fusion for Energy (F4E) - the Iter Organisation's European domestic agency - is undergoing factory acceptance tests. The component has already passed leak testing and its dimensions will now be checked.

Date: Wednesday, 07 February 2024
Original article: world-nuclear-news.org/Articles/First-European-made-ITER-vessel-sector-awaits-ship

The International Energy Agency (IEA) in its latest report, Electricity 2024, dedicates a significant amount of space to nuclear power – a departure from its previous studies which treated it as peripheral. In its press release on the new report, IEA says the increase in electricity generation from renewables and nuclear "appears to be pushing the power sector's emissions into structural decline". Over the next three years, low-emissions generation is set to rise at twice the annual growth rate between 2018 and 2023. Global emissions from electricity generation are expected to decrease by 2.4% in 2024, followed by smaller declines in 2025 and 2026.

Date: Friday, 26 January 2024
Original article: neimagazine.com/news/newsiea-acknowledges-significance-of-nuclear-energy-in-new-report-11463539

Manufacturing and testing of prototype first wall panels for the International Thermonuclear Experimental Reactor (ITER) fusion machine has been successfully completed, says St Petersburg-based JSC NIIEFA - part of the Russian state nuclear corporation Rosatom.

Date: Friday, 12 January 2024
Original article: world-nuclear-news.org/Articles/Russia-ready-to-mass-produce-first-wall-panels-for

At the 28th Conference of the Parties to the original 1992 United Nations Framework Convention on Climate Change (COP28), 22 countries signed a declaration supporting tripling nuclear energy capacity by 2050. The document was signed by the heads of state, or senior officials, from Bulgaria, Canada, the Czech Republic, Finland, France, Ghana, Hungary, Japan, South Korea, Moldova, Mongolia, Morocco, the Netherlands, Poland, Romania, Slovakia, Slovenia, Sweden, Ukraine, the United Arab Emirates, the UK and the USA. China and Russia did not sign, although they have the world’s fastest growing and most ambitious nuclear power programmes.

Date: Wednesday, 06 December 2023
Original article: neimagazine.com/news/newscop28-22-countries-target-tripling-global-nuclear-energy-capacity-by-2050-11347824

China has completed construction of the final batch of magnet-supporting products for the International Thermonuclear Experimental Reactor (ITER) project under construction in France. The consignment has been shipped to the ITER construction site from Guangzhou City in Guangdong Province. China, as a partner in the project, is responsible for the development and manufacturing of the entire magnet supporting system for ITER.

Date: Saturday, 11 November 2023
Original article: neimagazine.com/news/newschina-ships-last-batch-of-magnet-supporting-products-to-iter-11287112