Latest News

Filters

Filter by tags: Turkey Turbine Clear all tag filters

3 news articles found


The main components of the turbine plant of Akkuyu unit 1 - including the stator, turbine generator rotor and low-pressure cylinder - have been delivered to the construction site in Turkey.

Date: Friday, 18 March 2022
Original article: world-nuclear-news.org/Articles/Turbine-equipment-for-Akkuyu-1-delivered

US-based GE Steam Power said on 15 March that it had designed, manufactured and tested the Arabelle turbine’s first low pressure rotor equipped with the largest ever last-stage blade at 75 inches.

Date: Thursday, 18 March 2021
Original article: neimagazine.com/news/newsge-tests-largest-ever-last-stage-blade-for-arabelle-turbines-rotor-8606322

GE Steam Power announced today that it has designed and manufactured the largest-ever (75-inch) last-stage blade for its Arabelle low-pressure rotor. The blade will enable the Hinkley Point C nuclear power plant under construction in Somerset, England to produce 3.2 GWe of CO2 free power, GE said. Once completed, this Arabelle steam turbine will be the most powerful nuclear steam turbine in operation. It was tested at GE's factory in Belfort, France.

Date: Tuesday, 16 March 2021
Original article: world-nuclear-news.org/Articles/GE-Steam-Power-unveils-largest-last-stage-blade-ev

Status

No Tags found.