Filter by tags: Nuclear fuel United States Department of Energy Canada Silicon Clear all tag filters
3 news articles found
X-energy’s Triso-X facility is being funded initially as part of a $3.2bn federal programme to develop, build and demonstrate advanced reactors. The goal is for the plant to be commissioned and operational by 2025.
The fuel produced at the facility will be used in X-energy’s Xe-100 high-temperature gas reactors, expected to be operational by 2028. The first project would be a 320 MW four-unit Xe-100 power plant in Washington state.
The US Department of Energy said the fuel fabrication facility has the capacity to produce eight metric tonnes per year of Triso pebble fuel, enough to power 12 of X-energy’s proposed Xe-100 SMRs. The facility would also be capable of manufacturing TRISO fuel for other advanced reactor designs. X-energy said it plans to double its fuel production by the 2030s.
- Source: Nucnet
- Date: Wednesday, 19 October 2022
- Original article: nucnet.org/news/work-begins-on-triso-fabrication-plant-for-x-energy-s-htgr-10-2-2022
Ultra Safe Nuclear Corporation (USNC) has declared open the Pilot Fuel Manufacturing (PFM) facility, which will produce the first fuel for testing and qualification for use in the company's advanced Micro Modular Reactor (MMR). The plant will be the USA's first producer of private-sector TRISO and USNC's patented Fully Ceramic-Microencapsulated - or FCM - fuel.
- Source: World Nuclear News
- Date: Tuesday, 23 August 2022
- Original article: world-nuclear-news.org/Articles/Pilot-TRISO-fuel-manufacturing-plant-opens-in-Tenn
US-based X-energy announced on 9 August that it will expand its fuel division as a wholly owned subsidiary called TRISO-X to commercially develop its proprietary tristructural isotropic (TRISO) fuel for the burgeoning advanced nuclear energy sector. Dr Pete Pappano, X-energy’s Vice President of fuel production, will lead the new company as its President. Since joining X-energy in 2015, Dr Pappano has been instrumental in supporting the company’s ability to produce advanced nuclear fuel at a commercial scale. As the leader of X-energy’s ARC15 project, a five-year programme funded by the Department of Energy, he established a commercial-scale fuel line at Oak Ridge National Laboratory, which has demonstrated the company’s patented TRISO fabrication process leading to higher yields and higher quality fuel.
- Source: NEI Magazine
- Date: Friday, 13 August 2021
- Original article: neimagazine.com/news/newsx-energy-expands-triso-x-to-commercialise-its-advanced-nuclear-fuel-8991361