Filter by tags: Nuclear fuel Rosatom Clear all tag filters
154 news articles found
The second stage of the containment for Russia’s lead-cooled Brest-OD-300 fast reactor has been completed at the construction site on the territory of the Siberian Chemical Combine (part of Rosatom’s fuel company TVEL). The Brest-OD-300 reactor is part of the pilot demonstration power complex (ODEK - Opitno Demonstratsionovo Energo-Kompleksa), which is being developed under the Breakthrough (Proryv) project intended to demonstrate closed fuel cycle technology.
- Source: NEI Magazine
- Date: Wednesday, 24 April 2024
- Original article: neimagazine.com/news/newssecond-stage-of-containment-installed-for-brest-od-300-reactor-11705902
The 184-tonnes tier - the second of three - has been lifted into place for the lead-cooled fast neutron reactor under construction at the Siberian Chemical Combine site in Russia.
- Source: World Nuclear News
- Date: Saturday, 20 April 2024
- Original article: world-nuclear-news.org/Articles/Middle-tier-of-containment-installed-for-Brest-OD
Russian nuclear regulator Rostechnadzor has issued a licence which will allow the production of mock-ups of fuel assemblies with depleted uranium for the BREST-OD-300 fast neutron reactor.
- Source: World Nuclear News
- Date: Saturday, 13 April 2024
- Original article: world-nuclear-news.org/Articles/Licence-issued-to-test-BREST-OD-300-nuclear-fuel-m
The physical launch Russia’s BREST-OD-300 lead-cooled fast reactor in Seversk will be in 2026, with grid connection planned for the first half of 2027, according to Rosatom Director General Alexei Likhachev.
- Source: NEI Magazine
- Date: Wednesday, 06 March 2024
- Original article: neimagazine.com/news/newsrussias-brest-od-300-reactor-scheduled-for-physical-launch-in-2026-11572160
Unit 2 of France’s Cruas-Meysse NPP is now operating its first full core of recycled uranium fuel. EDF Nuclear & Thermal Park Director Cedric Lewandowski said this was “a historic step for the relaunch of the uranium reprocessing sector”.
- Source: NEI Magazine
- Date: Wednesday, 06 March 2024
- Original article: neimagazine.com/news/newscruas-meysse-2-restarts-using-recycled-uranium-fuel-11572476
Unit 2 of the Cruas-Meysse nuclear power plant in south-eastern France was recently restarted with its first full core of recycled uranium fuel. The move marks a major milestone in France's efforts to revive its domestic uranium reprocessing industry.
- Source: World Nuclear News
- Date: Saturday, 02 March 2024
- Original article: world-nuclear-news.org/Articles/French-reactor-using-full-core-of-recycled-uranium
Samples of the fuel began tests in two research reactors in 2022, with Rosatom reporting they "fundamentally confirmed the functionality of the fuel design" for high-temperature gas-cooled reactors (HTGR).
- Source: World Nuclear News
- Date: Wednesday, 21 February 2024
- Original article: world-nuclear-news.org/Articles/Reactor-testing-of-HTGR-fuel-confirms-functionalit
Russia’s Mining & chemical Combine (MCC - part of Rosatom) in Zheleznogorsk (Krasnoyarsk) has completed all R&D on a project for a molten salt research reactor (IZhSR - Issledovatelskovo Zhidko Solevovo Reaktora) MCC Director Dmitry Kolupaev told Rosatom Director General Alexey Likhachev Rosatom Alexei Likhachev during his visit to the enterprise that the key stages had been completed. A preliminary design has been developed that describes the fundamental decisions required for the physical launch of the IZhSR. This was achieved in cooperation with many other Russian organisations.
- Source: NEI Magazine
- Date: Saturday, 03 February 2024
- Original article: neimagazine.com/news/newsrussia-completes-rd-on-molten-salt-research-reactor-project-11486550
Construction of unit 5 at Russia’s Beloyarsk NPP with a BN1200 sodium-cooled fast neutron reactor will begin in 2027, according to plant director Ivan Sidorov. The BN1200 will be the world’s largest fast neutron reactor, replacing Beloyarsk 4 with a BN800 reactor, which previously held that record. Sidorov told the Beloyarsk corporate newspaper, Quick Neutron, that work at unit 5 was on schedule. "The site for the new unit has already been determined, public hearings on the placement have been held. In accordance with the programme, we are doing engineering research, we are drilling wells for them," he said.
- Source: NEI Magazine
- Date: Wednesday, 24 January 2024
- Original article: neimagazine.com/news/newsrussias-bn1200-to-begin-construction-in-2027-11456363
Rosatom says it has achieved a landmark milestone in construction of the lead-cooled fast neutron Brest-OD-300 reactor at the Siberian Chemical Combine (SCC - part of Rosatom’s TVEL fuel company) in Seversk, Tomsk Region. The steel reactor baseplate weighing 165 tonnes has been installed and workers have also loaded into the reactor shaft the first part of the reactor vessel – the lower tier of the containment.
- Source: NEI Magazine
- Date: Friday, 19 January 2024
- Original article: neimagazine.com/news/newsrosatom-begins-installation-of-the-brest-od-300-lead-cooled-fast-reactor-11445853