Latest News

Filters

Filter by tags: Small modular reactor France Generation IV reactor Clear all tag filters

3 news articles found


Amended legislation includes major research and development push with SMRs, Generation IV and clean hydrogen The Flamanville-3 EPR is the only nuclear power plant under construction in FRance. Courtesy EDF. The French Senate has adopted an amended bill that aims to reduce bureaucracy around the construction of new nuclear reactors and includes a provision for the removal of a 50% cap on the share of nuclear power in the electricity mix by 2035.

The bill, which still needs to go before the National Assembly, was adopted in first reading on 24 January by 239 votes to 16.

The bill aims to speed up procedures related to the construction of new nuclear facilities near existing nuclear sites and to the operation of existing installations.

Energy minister Agnès Pannier-Runacher hopes to save up to 56 months on construction by simplifying administrative procedures for building new facilities near existing nuclear sites.

The bill says France will pursue research and innovation efforts in the direction of nuclear energy and low-carbon hydrogen, in particular by supporting pressurised European reactors, small modular reactors, Generation IV reactors and the €20bn ($21bn) International Thermonuclear Experimental Reactor (Iter) nuclear fusion plant under construction at Cadarache in southern France.

Date: Saturday, 04 February 2023
Original article: nucnet.org/news/senate-passes-nuclear-bureaucracy-bill-as-country-gears-up-for-nuclear-renaissance-1-4-2023

Consultancy firm KPMG on 7 July released a report on nuclear energy market consultation, which discusses the conditions under which market parties are prepared to invest in NPPs in the Netherlands, what public support is required for this, and which regions are interested in establishing a nuclear plant. The 151-page report was compiled at the request of the House of Representatives in response to a motion by Klaas Dijkhoff put forward in September 2020. KPGM began work on the study on 8 February this year.

Date: Thursday, 15 July 2021
Original article: neimagazine.com/news/newskpmg-looks-at-feasibility-of-newbuild-in-netherlands-8893831

The challenges the nuclear industry faces are largely external and must be overcome if it is to help tackle the existential threat of climate change, panellists in the Nuclear Energy and its Future session of the Reuters Next conference on 11 January said. These challenges include: the notion nuclear is an out-dated technology; the cost of finance; market design; political changes; perceived competition with renewable energy; and the public's misconceptions about radioactive waste.

Date: Friday, 15 January 2021
Original article: world-nuclear-news.org/Articles/The-real-challenges-to-nuclear-are-external,-says