Latest News

Filters

Filter by tags: India Russia Clear all tag filters

316 news articles found


Chinese-French TAC-1 (CNPE) consortium has won a contract for the sub-assembly of modules for the vacuum vessel of the International Thermonuclear Experimental Reactor (ITER), under construction at Cadarache in southern France. The consortium includes China Nuclear Power Engineering (a subsidiary of China National Nuclear Corporation - CNNC); China Nuclear Industry 23 Construction Company Ltd; Southwestern Institute of Physics; Institute of Plasma Physics, Chinese Academy of Sciences ASIPP; and France’s Framatome.

Date: Wednesday, 13 March 2024
Original article: neimagazine.com/news/newschinese-french-consortium-to-assemble-iter-vacuum-chamber-11594527

Indian Prime Minister Narendra Modi has witnessed the start of fuel loading at the Prototype Fast Breeder Reactor (PFBR) at Kalpakkam in Tamil Nadu. The PFBR is a 500 MWe sodium-cooled fast breeder nuclear reactor being constructed at Kokkilamedu, near Kalpakkam. The Indira Gandhi Centre for Atomic Research (IGCAR) designed the reactor based on the decades of experience gained from operating the lower power Fast Breeder Test Reactor (FBTR).

Date: Wednesday, 06 March 2024
Original article: neimagazine.com/news/newsfuel-loading-begins-at-indias-pfbr-11572275

The Sino-French TAC-1 consortium - led by China National Nuclear Corporation subsidiary China Nuclear Power Engineering and including Framatome - has been awarded a contract to assemble the vacuum chamber modules of the International Thermonuclear Experimental Reactor (ITER), under construction in Cadarache, southern France.

Date: Wednesday, 06 March 2024
Original article: world-nuclear-news.org/Articles/Contract-for-ITER-vacuum-vessel-assembly

Indian Prime Minister Narendra Modi witnessed the start of fuel loading at the 500 MWe Prototype Fast Breeder Reactor at Kalpakkam in Tamil Nadu. Fast breeder reactors form the second stage of India's three-stage nuclear programme.

Date: Tuesday, 05 March 2024
Original article: world-nuclear-news.org/Articles/Fuel-loading-begins-at-Indian-fast-breeder-reactor

The ITER Organisation is preparing a new timeline for construction of the International Thermonuclear Experimental Reactor (ITER) being built at Cadarache in France. As part of work underway to update the ITER Project Baseline, a group of experts met in February to evaluate the new blueprint for achieving ITER's research goals.

Date: Friday, 23 February 2024
Original article: neimagazine.com/news/newsiter-prepares-new-timeline-11540250

The revamped project plan for the International Thermonuclear Experimental Reactor - with modifications to its configuration, phased installation and new research schedule - is being finalised ahead of being submitted to the ITER Council in June.

Date: Wednesday, 21 February 2024
Original article: world-nuclear-news.org/Articles/ITER-s-proposed-new-timeline-to-be-submitted-in-Ju

An extension to the 2008 intergovernmental agreement between India and Russia on the construction of stages II and III of the Kudankulam NPP in the southern state of Tamil Nadu was signed recently during a two-day visit to India by Rosatom Director General Alexei Likhachev.

Date: Thursday, 15 February 2024
Original article: neimagazine.com/news/newsindia-and-russia-strengthen-nuclear-cooperation-11512634