Filter by tags: India Vacuum Clear all tag filters
10 news articles found
Manufacturing and testing of prototype first wall panels for the International Thermonuclear Experimental Reactor (ITER) fusion machine has been successfully completed, says St Petersburg-based JSC NIIEFA - part of the Russian state nuclear corporation Rosatom.
- Source: World Nuclear News
- Date: Friday, 12 January 2024
- Original article: world-nuclear-news.org/Articles/Russia-ready-to-mass-produce-first-wall-panels-for
The International Thermonuclear Experimental Reactor (ITER) under construction at Saint-Paul-les-Durance in southern France is facing more delays, ITER director general Pietro Barabaschi said in an interview with AFP.
- Source: NEI Magazine
- Date: Friday, 13 January 2023
- Original article: neimagazine.com/news/newsmore-delays-for-iter-10511382
The International Thermonuclear Experimental Reactor (ITER) fusion project has given a progress update on tackling the defects discovered last year in the thermal shields and vacuum vessel sector. It hopes to tender for the thermal shield work, and have a contractor in place, by the end of March.
- Source: World Nuclear News
- Date: Friday, 13 January 2023
- Original article: world-nuclear-news.org/Articles/ITER-to-replace-23km-of-cooling-pipes-on-thermal-s
“When building a machine as large and as complex as ITER, difficulties and setbacks do not come as surprises - they are an integral part of manufacturing, assembling and installing first-of-a-kind components,” the ITER Organisation said recently.
- Source: NEI Magazine
- Date: Friday, 25 November 2022
- Original article: neimagazine.com/news/newsiter-says-essential-key-components-repairs-will-impact-schedule-10381371
China National Nuclear Corp's Southwestern Institute of Physics says that the first piece of the enhanced heat flux first wall for the International Thermonuclear Experimental Reactor has been produced, with its core indicators better than design requirements.
- Source: World Nuclear News
- Date: Friday, 25 November 2022
- Original article: world-nuclear-news.org/Articles/China-celebrates-first-enhanced-heat-flux-first-wa
Iter said in a project update that the two components are the vacuum vessel thermal shields and the vacuum vessel sectors.
The issues “demand in-depth examination, creativity in devising corrective actions, and time and budget to repair”, Iter said.
The vacuum vessel thermal shields are actively cooled silver-plated elements, 20 mm thick that contribute to thermally insulating the plant’s superconducting magnet system operating at 4K, or minus 269C.
- Source: Nucnet
- Date: Thursday, 24 November 2022
- Original article: nucnet.org/news/eur20-billion-project-faces-delays-as-defects-found-in-two-key-first-of-a-kind-components-11-3-2022
The International Thermonuclear Experimental Reactor (ITER) project has announced defects have been discovered in the thermal shields and vacuum vessel sectors and warned that the consequences on schedule and cost "will not be insignificant".
- Source: World Nuclear News
- Date: Wednesday, 23 November 2022
- Original article: world-nuclear-news.org/Articles/Defects-found-in-two-key-components-of-ITER-tokama
After a decade of design and fabrication, US-based General Atomics said on 15 June that it is ready to ship the first module of the Central Solenoid to the International Thermonuclear Experimental Reactor (ITER) under construction in Saint-Paul-lès-Durance in southern France. Despite the challenges of Covid-19, ITER is almost 75% built and massive first-of-a-kind components have been arriving in France from three continents over the past 15 months. Construction of ITER is funded mainly by the European Union (45.6%) with the remainder shared equally by China, India, Japan, Korea, Russia and the USA (9.1% each). However, in practice, the members deliver little monetary contribution to the project, instead providing ‘in-kind’ contributions of components, systems or buildings.
- Source: NEI Magazine
- Date: Wednesday, 16 June 2021
- Original article: neimagazine.com/news/newsgeneral-atomics-prepares-to-ship-first-module-of-iters-central-solenoid-8822680
From a childhood fascination with "what small means" to simulating the power of the sun to bring affordable energy to all of mankind. This is the journey described by Sergio Orlandi, head of the Central Engineering and Plant Directorate at the International Thermonuclear Experimental Reactor (ITER).
- Source: World Nuclear News
- Date: Wednesday, 05 May 2021
- Original article: world-nuclear-news.org/Articles/ITERs-mission-to-fuel-the-future-of-humanity
The European consortium of AMW (Ansaldo Nucleare S.p.A, Mangiarotti S.p.A and Walter Tosto S.p.A) has won a EUR 300 million contract for the supply of seven sectors of the ITER vacuum vessel.
Exploded ITER vacuum vessel segment
- Source: NEI Magazine
- Date: Thursday, 21 October 2010
- Original article: neimagazine.com/news/newsamw-wins-iter-vacuum-vessel-contract