Latest News

Filters

Filter by tags: Uranium TVEL Clear all tag filters

5 news articles found


The 184-tonnes tier - the second of three - has been lifted into place for the lead-cooled fast neutron reactor under construction at the Siberian Chemical Combine site in Russia.

Date: Saturday, 20 April 2024
Original article: world-nuclear-news.org/Articles/Middle-tier-of-containment-installed-for-Brest-OD

The Novosibirsk Chemical Concentrate Plant (NCCP or NZKhK – Novosibirskii Zavod KhimConsentratov), part of Rosatom’s fuel company TVEL, has signed a contract with the Egypt Atomic Energy Authority (EAEA) for the supply of low-enriched nuclear fuel components for the ETRR-2 research reactor. The products include uranium components, as well as aluminium alloy products and aluminium powder. Delivery will be completed in 2024.

Date: Wednesday, 14 February 2024
Original article: neimagazine.com/news/newsrosatom-to-supply-of-fuel-components-for-the-egypts-etrr-2-research-reactor-11511973

The first three fuel assemblies with uranium-plutonium mixed oxide fuel containing transuranic elements americium-241 and neptunium-237 have been produced by Rosatom's Mining and Chemical Combine.

Date: Saturday, 16 December 2023
Original article: world-nuclear-news.org/Articles/Mixed-oxide-fuel-with-minor-actinides-produced-for

TVEL has announced the suspension of its work to upgrade the Fordow Fuel Enrichment Plant because Iran fed uranium hexafluoride (UF6) into two gas centrifuge cascades located in the same room as the cascades meant to be reengineered for stable medical isotope production.

Date: Saturday, 07 December 2019
Original article: world-nuclear-news.org/Articles/Russia-suspends-Fordow-project-in-Iran

Countries

Status

No Tags found.