Latest News

Filters

Filter by tags: Russia China United States Clear all tag filters

397 news articles found


Netherlands-based AMG Critical Materials has established a new company, NewMOX SAS in Grenoble, France, to service the nuclear fuel market. NewMOX is a subsidiary of ALD Vacuum Technologies based in Hanau, Germany. ALD is AMG’s engineering subsidiary focused on vacuum furnace technology, which includes sintering furnace systems enabling the production of commercial nuclear fuel from plutonium and depleted uranium mixed oxides (mox). ALD’s MOX technology has been applied in Germany, the USA, France, Belgium, the UK and recently ALD has been delivering furnace systems to China. ALD inherited the mox technology from Degussa AG, ALD’s former owner (later renamed Evonik AG).

Date: Wednesday, 10 April 2024
Original article: neimagazine.com/news/newsamg-establishes-new-company-to-support-mox-production-11669474

In early April, the first shipment of equipment in 2024 for the International Thermonuclear Experimental Reactor (ITER), which is being built in France, will take place from Russia’s DV Efremov Institute of Electrophysical Apparatus (NIIEFA, part of Rosatom). The equipment was developed and manufactured at NIIEFA in St Petersburg by order of Rosatom, within the framework of the International ITER project.

Date: Wednesday, 20 March 2024
Original article: neimagazine.com/news/newsrosatom-prepares-equipment-for-iter-11612622

Chinese-French TAC-1 (CNPE) consortium has won a contract for the sub-assembly of modules for the vacuum vessel of the International Thermonuclear Experimental Reactor (ITER), under construction at Cadarache in southern France. The consortium includes China Nuclear Power Engineering (a subsidiary of China National Nuclear Corporation - CNNC); China Nuclear Industry 23 Construction Company Ltd; Southwestern Institute of Physics; Institute of Plasma Physics, Chinese Academy of Sciences ASIPP; and France’s Framatome.

Date: Wednesday, 13 March 2024
Original article: neimagazine.com/news/newschinese-french-consortium-to-assemble-iter-vacuum-chamber-11594527

The Sino-French TAC-1 consortium - led by China National Nuclear Corporation subsidiary China Nuclear Power Engineering and including Framatome - has been awarded a contract to assemble the vacuum chamber modules of the International Thermonuclear Experimental Reactor (ITER), under construction in Cadarache, southern France.

Date: Wednesday, 06 March 2024
Original article: world-nuclear-news.org/Articles/Contract-for-ITER-vacuum-vessel-assembly

The Nuclear Energy Agency (NEA) has published the second edition of its Small Modular Reactor Dashboard which tracks the progress of selected small modular reactor (SMR) designs towards deployment. NEA says the SMR designs are at various stages of development, from fundamental research on new concepts to commercial deployment and operation of mature designs.

Date: Saturday, 02 March 2024
Original article: neimagazine.com/news/newsnea-launches-second-edition-of-its-small-modular-reactor-dashboard-11561305

Korea Hydro & Nuclear Power (KHNP) has signed a Letter of Intent with US nuclear fuel and services company Centrus Energy to ensure a stable supply of nuclear fuel. It follows the signing of a memorandum of understanding between the two companies in April last year.

Date: Wednesday, 28 February 2024
Original article: world-nuclear-news.org/Articles/KHNP,-Centrus-enhance-cooperation-in-fuel-supply

The ITER Organisation is preparing a new timeline for construction of the International Thermonuclear Experimental Reactor (ITER) being built at Cadarache in France. As part of work underway to update the ITER Project Baseline, a group of experts met in February to evaluate the new blueprint for achieving ITER's research goals.

Date: Friday, 23 February 2024
Original article: neimagazine.com/news/newsiter-prepares-new-timeline-11540250

The revamped project plan for the International Thermonuclear Experimental Reactor - with modifications to its configuration, phased installation and new research schedule - is being finalised ahead of being submitted to the ITER Council in June.

Date: Wednesday, 21 February 2024
Original article: world-nuclear-news.org/Articles/ITER-s-proposed-new-timeline-to-be-submitted-in-Ju

The first of five vacuum vessel sectors for the International Thermonuclear Experimental Reactor (ITER) under construction at Cadarache in France to be supplied by Fusion for Energy (F4E) is undergoing factory acceptance tests. The component has already passed leak testing and its dimensions will now be checked.

Date: Friday, 09 February 2024
Original article: neimagazine.com/news/newsiter-vacuum-vessel-sector-undergoes-factory-acceptance-testing-11501287