Filter by tags: Russia India Clear all tag filters
317 news articles found
Netherlands-based AMG Critical Materials has established a new company, NewMOX SAS in Grenoble, France, to service the nuclear fuel market. NewMOX is a subsidiary of ALD Vacuum Technologies based in Hanau, Germany. ALD is AMG’s engineering subsidiary focused on vacuum furnace technology, which includes sintering furnace systems enabling the production of commercial nuclear fuel from plutonium and depleted uranium mixed oxides (mox). ALD’s MOX technology has been applied in Germany, the USA, France, Belgium, the UK and recently ALD has been delivering furnace systems to China. ALD inherited the mox technology from Degussa AG, ALD’s former owner (later renamed Evonik AG).
- Source: NEI Magazine
- Date: Wednesday, 10 April 2024
- Original article: neimagazine.com/news/newsamg-establishes-new-company-to-support-mox-production-11669474
Position paper says substantial efforts needed if reactors are to fulfil vital role
- Source: Nucnet
- Date: Thursday, 21 March 2024
- Original article: nucnet.org/news/bloc-lagging-behind-rest-of-world-in-key-areas-of-nuclear-research-3-3-2024
Chinese-French TAC-1 (CNPE) consortium has won a contract for the sub-assembly of modules for the vacuum vessel of the International Thermonuclear Experimental Reactor (ITER), under construction at Cadarache in southern France. The consortium includes China Nuclear Power Engineering (a subsidiary of China National Nuclear Corporation - CNNC); China Nuclear Industry 23 Construction Company Ltd; Southwestern Institute of Physics; Institute of Plasma Physics, Chinese Academy of Sciences ASIPP; and France’s Framatome.
- Source: NEI Magazine
- Date: Wednesday, 13 March 2024
- Original article: neimagazine.com/news/newschinese-french-consortium-to-assemble-iter-vacuum-chamber-11594527
Indian Prime Minister Narendra Modi has witnessed the start of fuel loading at the Prototype Fast Breeder Reactor (PFBR) at Kalpakkam in Tamil Nadu. The PFBR is a 500 MWe sodium-cooled fast breeder nuclear reactor being constructed at Kokkilamedu, near Kalpakkam. The Indira Gandhi Centre for Atomic Research (IGCAR) designed the reactor based on the decades of experience gained from operating the lower power Fast Breeder Test Reactor (FBTR).
- Source: NEI Magazine
- Date: Wednesday, 06 March 2024
- Original article: neimagazine.com/news/newsfuel-loading-begins-at-indias-pfbr-11572275
Delayed nuclear unit could be operational this year
- Source: Nucnet
- Date: Wednesday, 06 March 2024
- Original article: nucnet.org/news/fuel-loading-begins-at-india-s-first-prototype-fast-breeder-3-2-2024
The Sino-French TAC-1 consortium - led by China National Nuclear Corporation subsidiary China Nuclear Power Engineering and including Framatome - has been awarded a contract to assemble the vacuum chamber modules of the International Thermonuclear Experimental Reactor (ITER), under construction in Cadarache, southern France.
- Source: World Nuclear News
- Date: Wednesday, 06 March 2024
- Original article: world-nuclear-news.org/Articles/Contract-for-ITER-vacuum-vessel-assembly
Indian Prime Minister Narendra Modi witnessed the start of fuel loading at the 500 MWe Prototype Fast Breeder Reactor at Kalpakkam in Tamil Nadu. Fast breeder reactors form the second stage of India's three-stage nuclear programme.
- Source: World Nuclear News
- Date: Tuesday, 05 March 2024
- Original article: world-nuclear-news.org/Articles/Fuel-loading-begins-at-Indian-fast-breeder-reactor
The ITER Organisation is preparing a new timeline for construction of the International Thermonuclear Experimental Reactor (ITER) being built at Cadarache in France. As part of work underway to update the ITER Project Baseline, a group of experts met in February to evaluate the new blueprint for achieving ITER's research goals.
- Source: NEI Magazine
- Date: Friday, 23 February 2024
- Original article: neimagazine.com/news/newsiter-prepares-new-timeline-11540250
Dutch government has chosen Borssele site as preferred location for two new reactors
- Source: Nucnet
- Date: Friday, 23 February 2024
- Original article: nucnet.org/news/westinghouse-to-evaluate-ap1000-reactor-technology-for-ambitious-new-nuclear-programme-2-4-2024
The revamped project plan for the International Thermonuclear Experimental Reactor - with modifications to its configuration, phased installation and new research schedule - is being finalised ahead of being submitted to the ITER Council in June.
- Source: World Nuclear News
- Date: Wednesday, 21 February 2024
- Original article: world-nuclear-news.org/Articles/ITER-s-proposed-new-timeline-to-be-submitted-in-Ju