Latest News

Filters

Filter by tags: European Bank for Reconstruction and Development Japan Clear all tag filters

8 news articles found


The ISF-2 interim storage facility at Chernobyl. Courtesy EBRD. Ukraine’s nuclear regulator has issued a licence for full operation of the he €400m ISF-2 interim storage facility at the Chernobyl nuclear power station site in Ukraine, Chernobyl NPP announced.

The milestone represents the culmination of more than 20 years of work at the site, where spent nuclear fuel from reactors 1, 2 and 3 at the destroyed nuclear station will be processed and stored at ISF-2, the world’s largest nuclear dry storage facility.

ISF-2 has been constructed by an international consortium led by the US company Holtec and financed by the international community through the Nuclear Safety Account, managed by the European Bank for Reconstruction and Development.

Hot testing with the first full fuel load at ISF-2 began in September 2020 and at the time the EBRD said the full licence to operate was expected in early 2021. Chernobyl NPP said last week that hot testing had been completed and was successful.

Date: Tuesday, 27 April 2021
Original article: nucnet.org/news/regulator-issues-licence-for-full-operation-of-isf-2-interim-storage-facility-4-1-2021

The European Bank for Reconstruction and Development (EBRD) announced that the first canister of used nuclear fuel had been loaded into the Interim Storage Facilty 2 (ISF-2) at the Chernobyl Nuclear Power Plant.

Date: Friday, 20 November 2020
Original article: neimagazine.com/news/newsfirst-canister-of-used-fuel-loaded-at-chernobyl-storage-facility-8369174

Milestone follows 20 years of work at the Ukraine site Courtesy EBRD. The first waste canister of spent nuclear fuel was loaded into the €400m ISF-2 interim storage facility at the Chernobyl nuclear power station site in Ukraine on Wednesday, the European Bank for Reconstruction and Development announced.

The milestone represents the culmination of more than 20 years of work at the site, where spent nuclear fuel from reactors 1, 2 and 3 at the destroyed nuclear station will be processed and stored at ISF-2, the world’s largest nuclear dry storage facility.

ISF-2 has been constructed by an international consortium led by the US company Holtec and financed by the international community through the Nuclear Safety Account, managed by the EBRD.

The first loaded double-walled canister contains 93 spent fuel assemblies that have been removed from the site’s ageing storage facility, and processed and packaged in the new ISF-2 facility. In total, more than 21,000 spent fuel assemblies from Chernobyl reactors 1, 2 and 3 will make this journey over the next eight or more years. The ISF-2 is the largest dry spent fuel storage facility in the world and has a lifespan of a minimum of 100 years.

Hot testing at ISF-2 began earlier this year and the full licence to operate is expected in early 2021. “Important work remains to be completed to secure the full operating licence, but the successful testing and loading of the first full fuel load provides all those involved with cause for some celebration,” said Steven White, EBRD associate director, nuclear safety.

Date: Friday, 20 November 2020
Original article: nucnet.org/news/first-spent-nuclear-fuel-canister-loaded-in-isf-2-storage-facility-11-4-2020

The Ministry of Energy of Uzbekistan has announced the development of a national Low-Carbon Energy Strategy with assistance from the European Bank for Reconstruction and Development (EBRD), and international consulting company Corporate Solutions. Uzbekistan plans to develop alternative energy sources, including solar, hydro and wind, to produce electricity with low-carbon emissions. Uzbekistan also plans to build Central Asia’s first nuclear power plant, to provide the country with "uninterrupted and high-quality electricity on an industrial scale", the ministry said.

Date: Friday, 29 May 2020
Original article: world-nuclear-news.org/Articles/Uzbekistan-unveils-low-carbon-energy-strategy