Latest News

Filters

Filter by tags: United Kingdom European Union Germany China Belgium Clear all tag filters

5 news articles found


The International Energy Agency (IEA) in its latest report, Electricity 2024, dedicates a significant amount of space to nuclear power – a departure from its previous studies which treated it as peripheral. In its press release on the new report, IEA says the increase in electricity generation from renewables and nuclear "appears to be pushing the power sector's emissions into structural decline". Over the next three years, low-emissions generation is set to rise at twice the annual growth rate between 2018 and 2023. Global emissions from electricity generation are expected to decrease by 2.4% in 2024, followed by smaller declines in 2025 and 2026.

Date: Friday, 26 January 2024
Original article: neimagazine.com/news/newsiea-acknowledges-significance-of-nuclear-energy-in-new-report-11463539

The European Union's clean energy transition "leaves a number of legacy technologies on the side" with an approach that is "more political economy than market economy", an analyst from S&P Global Ratings’ Infrastructure and Utilities practice said this week.

Date: Thursday, 19 November 2020
Original article: world-nuclear-news.org/Articles/S-P-sees-limited-role-for-nuclear-in-EU-energy-tra

A surge in well-designed energy policies is needed to put the world on track for a resilient energy system that can meet climate goals, the International Energy Agency said today. Unveiling the latest edition of its flagship publication, the Paris-based organisation noted that worldwide low-carbon electricity generation from nuclear and renewable energies had exceeded coal-fired generation for the first time last year.

Date: Wednesday, 14 October 2020
Original article: world-nuclear-news.org/Articles/IEA-report-highlights-need-for-new-momentum-behind

Policy uncertainty is ‘preventing industry from making investment decisions’ Policy uncertainty in a number of countries is preventing the nuclear industry from making investment decisions and “forthright recognition” by governments of the value of nuclear energy would encourage policymakers to explicitly include nuclear in their long-term energy plans and commitments under the Paris Agreement, the International Energy Agency has said.

The Paris-based agency said in a report on meeting climate goals that nuclear policy uncertainty is partly the result of inconsistencies between stated policy goals – such as climate change mitigation – and policy actions.

While some countries maintain they can meet decarbonisation objectives while phasing out nuclear (Belgium, Germany, Spain, Switzerland) or reducing its share (France), others continue to recognise the need to increase nuclear reliance: China, Russia, India, Argentina, Brazil, Bulgaria, the Czech Republic, Egypt, Finland, Hungary, Poland, Saudi Arabia, the United Arab Emirates, the UK and Uzbekistan.

In late 2018, the EU long-term energy strategy clearly stated that nuclear power – together with renewables – will form the backbone of the EU power system in order to reach carbon neutrality by 2050, the IEA said. At the same time, ongoing EU taxonomy discussions regarding the eligibility of nuclear power generation for sustainability funding highlight the difficulties in recognising the contribution that nuclear energy makes to climate change mitigation.

Date: Friday, 12 June 2020
Original article: nucnet.org/news/agency-calls-for-forthright-recognition-of-nuclear-energy-6-4-2020

New-build projects are making progress, but governments are still struggling with finding the right financing package for large reactors The delayed Flamanville-3 is one of three EPR units under construction in Europe. The others are at Olkiluoto in Finland and Hinkley Point in the UK. Photo courtesy EDF. Western Europe

The UK is facing a major challenge to replace its aging fleet of Generation I nuclear power plants, many of which are scheduled to shut down in 2023.

The project by French state utility EDF to build two Generation III EPR units at Hinkley Point C in Somerset is on track for connection to the grid by 2025. Once in commercial operation the two units will provide up to 7% of the total electricity demand. Two similar units are planned for the Sizewell site in Suffolk.

However, press reports have suggested EDF is in “a race against time” to secure a funding deal for Sizewell C as delays risk making the project prohibitively expensive.

According to The Times newspaper EDF has hired Rothschild as financial adviser for the project and says it wants a “definitive way forward” from the government this year so it can start construction in 2022.

Date: Friday, 17 January 2020
Original article: nucnet.org/news/what-lies-in-store-in-2020-1-4-2020