Filter by tags: Switzerland Spain Clear all tag filters
29 news articles found
Remediation works at Mailuu-Suu - the largest uranium legacy site in Kyrgyzstan - are set to begin following the allocation of a grant of EUR23 million (USD25 million) from the Environmental Remediation Account for Central Asia (ERA), managed by the European Bank for Reconstruction and Development (EBRD).
- Source: World Nuclear News
- Date: Saturday, 20 May 2023
- Original article: world-nuclear-news.org/Articles/Remediation-of-Kyrgyz-uranium-legacy-site-to-start
An Integrated Regulatory Review Service (IRRS) team from the International Atomic Energy Agency (IAEA) has concluded a 13-day mission to Argentina. The IRRS team reviewed all regulatory functions and responsibilities of the Nuclear Regulatory Authority (ARN) against international safety standards and concluded that the regulator had demonstrated a long-standing commitment to enhancing and promoting nuclear safety. The team also recommended areas where improvements can be made. The mission was conducted at the request of the Government of Argentina and hosted by ARN.
- Source: NEI Magazine
- Date: Friday, 16 September 2022
- Original article: neimagazine.com/news/newsiaea-mission-reviews-nuclear-regulation-in-argentina-10009986
The European Bank for Reconstruction and Development (EBRD) will provide Uzbekistan with a grant of €7 million ($6.95m) to support work on the reclamation of uranium legacy sites at Charkesar and Yangiabad, the press service of State Committee of Uzbekistan on Ecology and Environmental Protection (SCUEEP) and EBRD have reported. The agreement for the grant project was signed on 1 September in London by SCUEEP Chairman Narzullo Oblomuradov and Balthazar Lindauer, Director of the EBRD Nuclear Safety Department.
- Source: NEI Magazine
- Date: Wednesday, 07 September 2022
- Original article: neimagazine.com/news/newsuzbekistan-receives-ebrd-grant-to-remediate-legacy-uranium-sites-9980584
Environmental remediation of former uranium mining sites at Yangiabad and Charkesar in Uzbekistan is set to begin following the signing of a EUR7 million (USD7 million) grant agreement between the Environmental Remediation Account for Central Asia (ERA) and the Uzbek government.
- Source: World Nuclear News
- Date: Tuesday, 06 September 2022
- Original article: world-nuclear-news.org/Articles/Cleanup-of-two-Uzbek-sites-to-start-in-early-2023
Ukraine has received a large batch of vital radiation protection and monitoring equipment offered by Australia and France and delivered by the International Atomic Energy Agency (IAEA), IAEA Director General Rafael Mariano Grossi has said.
- Source: NEI Magazine
- Date: Thursday, 21 July 2022
- Original article: neimagazine.com/news/newsiaea-delivers-radiation-monitoring-equipment-to-ukraine-9861624
Work to manage the legacy wastes from historic uranium mining at sites in Shekaftar and Min-Kush has been completed, the European Bank for Reconstruction and Development (EBRD) announced. The work was completed on schedule and below the projected budget.
- Source: World Nuclear News
- Date: Tuesday, 29 March 2022
- Original article: world-nuclear-news.org/Articles/Remediation-of-two-Kyrgyz-uranium-legacy-sites-com
Protocols to amend two international instruments strengthening the rights to compensation for those affected by nuclear energy accidents have been formally ratified and will enter into force on 1 January.
- Source: World Nuclear News
- Date: Wednesday, 22 December 2021
- Original article: world-nuclear-news.org/Articles/Nuclear-liability-protocols-ratified-to-strengthen
A renewed call has been made for additional donor funding in order to tackle the most urgent problems caused by radioactive and toxic waste at legacy uranium sites in Central Asia, with the International Atomic Energy Agency (IAEA) estimating an additional EUR40 million (USD47 million) is required. The call came as all parties directly involved in the project signed a revised Strategic Master Plan.
- Source: World Nuclear News
- Date: Thursday, 23 September 2021
- Original article: world-nuclear-news.org/Articles/More-funding-needed-to-complete-Central-Asian-reme
The OECD Nuclear Energy Agency (NEA) on 18 July released a new study, “Ensuring the Adequacy of Funding Arrangements for Decommissioning and Radioactive Waste Management”. The 239-page document comprises a conceptual framework, 12 detailed country case studies on funding arrangements prepared in collaboration with NEA countries, and some best policy guidelines. It focuses on the interdependence of costs and funding requirements and changes in nuclear policy, such as long-term operation or premature shutdowns, as well as technological progress.
- Source: NEI Magazine
- Date: Tuesday, 22 June 2021
- Original article: neimagazine.com/news/newsnea-looks-at-future-funding-of-decommissioning-and-radwaste-management-8837347
The International Atomic Energy Agency (IAEA) said on 2 July that the recent detection of slightly elevated levels of radioisotopes in northern Europe is likely related to a nuclear reactor that is either operating or undergoing maintenance, when very low radioactive releases can occur. The geographical origin of the release has not yet been determined.
- Source: NEI Magazine
- Date: Wednesday, 08 July 2020
- Original article: neimagazine.com/news/newsiaea-reports-on-elevated-radiation-levels-in-northern-europe-8013677