Latest News

Filters

Filter by tags: India Russia Clear all tag filters

317 news articles found


Netherlands-based AMG Critical Materials has established a new company, NewMOX SAS in Grenoble, France, to service the nuclear fuel market. NewMOX is a subsidiary of ALD Vacuum Technologies based in Hanau, Germany. ALD is AMG’s engineering subsidiary focused on vacuum furnace technology, which includes sintering furnace systems enabling the production of commercial nuclear fuel from plutonium and depleted uranium mixed oxides (mox). ALD’s MOX technology has been applied in Germany, the USA, France, Belgium, the UK and recently ALD has been delivering furnace systems to China. ALD inherited the mox technology from Degussa AG, ALD’s former owner (later renamed Evonik AG).

Date: Wednesday, 10 April 2024
Original article: neimagazine.com/news/newsamg-establishes-new-company-to-support-mox-production-11669474

Chinese-French TAC-1 (CNPE) consortium has won a contract for the sub-assembly of modules for the vacuum vessel of the International Thermonuclear Experimental Reactor (ITER), under construction at Cadarache in southern France. The consortium includes China Nuclear Power Engineering (a subsidiary of China National Nuclear Corporation - CNNC); China Nuclear Industry 23 Construction Company Ltd; Southwestern Institute of Physics; Institute of Plasma Physics, Chinese Academy of Sciences ASIPP; and France’s Framatome.

Date: Wednesday, 13 March 2024
Original article: neimagazine.com/news/newschinese-french-consortium-to-assemble-iter-vacuum-chamber-11594527

Indian Prime Minister Narendra Modi has witnessed the start of fuel loading at the Prototype Fast Breeder Reactor (PFBR) at Kalpakkam in Tamil Nadu. The PFBR is a 500 MWe sodium-cooled fast breeder nuclear reactor being constructed at Kokkilamedu, near Kalpakkam. The Indira Gandhi Centre for Atomic Research (IGCAR) designed the reactor based on the decades of experience gained from operating the lower power Fast Breeder Test Reactor (FBTR).

Date: Wednesday, 06 March 2024
Original article: neimagazine.com/news/newsfuel-loading-begins-at-indias-pfbr-11572275

The Sino-French TAC-1 consortium - led by China National Nuclear Corporation subsidiary China Nuclear Power Engineering and including Framatome - has been awarded a contract to assemble the vacuum chamber modules of the International Thermonuclear Experimental Reactor (ITER), under construction in Cadarache, southern France.

Date: Wednesday, 06 March 2024
Original article: world-nuclear-news.org/Articles/Contract-for-ITER-vacuum-vessel-assembly

Indian Prime Minister Narendra Modi witnessed the start of fuel loading at the 500 MWe Prototype Fast Breeder Reactor at Kalpakkam in Tamil Nadu. Fast breeder reactors form the second stage of India's three-stage nuclear programme.

Date: Tuesday, 05 March 2024
Original article: world-nuclear-news.org/Articles/Fuel-loading-begins-at-Indian-fast-breeder-reactor

The ITER Organisation is preparing a new timeline for construction of the International Thermonuclear Experimental Reactor (ITER) being built at Cadarache in France. As part of work underway to update the ITER Project Baseline, a group of experts met in February to evaluate the new blueprint for achieving ITER's research goals.

Date: Friday, 23 February 2024
Original article: neimagazine.com/news/newsiter-prepares-new-timeline-11540250

The revamped project plan for the International Thermonuclear Experimental Reactor - with modifications to its configuration, phased installation and new research schedule - is being finalised ahead of being submitted to the ITER Council in June.

Date: Wednesday, 21 February 2024
Original article: world-nuclear-news.org/Articles/ITER-s-proposed-new-timeline-to-be-submitted-in-Ju